Skip to main content

Table 3 Performance parameter analysis of standard IEEE-9 bus system using heuristic pdf method

From: Optimal Location and Sizing of Conglomerate DG- FACTS using an Artificial Neural Network and Heuristic Probability Distribution Methodology for Modern Power System Operations

Line to line

line real power losses (pu)

Performance parameter estimation at different buses

Bus No

Accuracy (pu)

Selectivity (%)

THD (%) of real power

MSE (%)

1–4

0.68

1

0.092

0.08

17.85

9.98 × 10–8

4–5

0.55

2

0.079

0.093

18.86

19.54 × 10–7

5–6

0.49

3

0.077

0.091

18.17

10.9 × 10–6

3–6

0.45

4

0.085

0.091

17.83

11.6 × 10–5

6–7

0.53

5

0.095

0.082

16.86

30.56 × 10–5

7–8

0.56

6

0.092

0.073

17.86

45.6 × 10–7

8–2

0.55

7

0.09

0.078

18.87

41.3 × 10–8

8–9

0.59

8

0.088

0.074

18.89

35.710–6

9–4

0.61

9

0.086

0.073

20.5

57.9 × 10–6