Skip to main content

Table 18 Power flow comparison with and without presence of TCSC between the buses no. 9 and 10 for IEEE 57- bus system

From: Optimal Location and Sizing of Conglomerate DG- FACTS using an Artificial Neural Network and Heuristic Probability Distribution Methodology for Modern Power System Operations

Bus No

Without TCSC

With TCSC

Heuristic pdf

ANN

 

P (p.u)

Q (p.u)

P (p.u)

Q (p.u)

P (p.u)

Q (p.u)

9

1.38

1.26

0.97

1.01

0.95

0.88

10

1.39

1.37

0.98

1.12

0.90

0.86