Skip to main content

Table 3 EEDR results in IEEE 14-bus and Algerian 114-bus systems in the case of line tripping

From: Power system voltage instability risk mitigation via emergency demand response-based whale optimization algorithm

SystemEventsLocationAmount (%)Total amountTotal cost [$/hr]VSI
Before EEDRAfter EEDR
IEEE 14-busLoss of the line (1–2)4
5
7
14
9
47
14
4
15
35
21.4330 MW,
3.6351 MVAr
446.87910.03810.3004
Algerian 114-busLoss of the line (63–66)89
68
92
67
4
45
2
69
6.3631 MW,
3.0578 MVAr
550.57590.12610.3000
Loss of the line (81–90)89
68
92
67
41
0
2
0
8.4208 MW,
4.2103 MVAr
287.58270.17200.3001