Abstract

Heavy fault currents flow in the event of fault at the loads connected in distribution system. To protect these loads, circuit breakers and relays are required at appropriate places with proper coordination between them. This research paper focuses on finding optimum relay setting required for minimum time to interrupt power supply to avoid miscoordination in operation of relays and also investigates effect on time multiplier settings (TMS) of directional overcurrent relays in a system with combined overhead lines-underground cables. Linear programming problem (LPP) approach is used for optimization. It is interesting to know the quantitative variations in TMS as the underground cables have different characteristics than overhead lines.

1 Introduction

Shunt faults occurring in power distribution systems increases current suddenly. This sudden increase in the value of current is a positive indication that fault has occurred in a system. In order to isolate a faulty section from healthy section, protection schemes are used in power systems. The overcurrent protection schemes are most popularly used for protection of power systems [1,2,3]. In some protection schemes overcurrent relay protection is the only protection scheme provided in networks. Each primary relay protects its specific zone. If primary relay fails to isolate faulty section the backup protection relay is provided to clear the fault. Generally power system has a number of equipments and a number of protection relays in order to provide protection to whole system under consideration. Therefore coordination between relays plays an important role in protection schemes. If primary and backup relays are not in appropriate coordination with each other malfunctioning will take place in operation of primary and back up relays. Hence coordination in operation of overcurrent relays play a vital role in designing appropriate protection schemes for any power system network [4, 5].

As the size of network increases, to obtain proper overall coordination between large number of primary and back up relays becomes a complicated problem. Hence, along with conventional methods for optimization, Artificial Intelligence based methods like Teaching Learning Based algorithms, Fuzzy logic, nature inspired algorithms (NIA), expert systems rules consideration, particle swarm optimization (PSO), Honey Bee algorithm, Harmony search algorithm, Artificial Bees colony etc. are reported by various researchers to optimize co-ordination of both directional and non directional overcurrent relays [6, 7].

In the radial power system with only one source of generation there is flow of fault current and load current in only one direction. In case of directional relays being used, they will operate in the event of flow of fault current in the specified direction of tripping and hence do not need coordination with the relays which are behind them. However coordination is necessary in primary and backup relays, if primary relay fails to operate, back up relay must operate to isolate faulty section from healthy section. Also in radial power systems with combined overhead lines-underground cables, the coordination in primary and backup directional overcurrent relays becomes essential due to high charging current and capacitance of underground cables. With increased capacitance, the charging current of underground cable also increases, which may be as high as significant fraction of the load current. This imposes limitations on minimum relay settings [8, 9].

When the mode of operation is changed such as power system with more than one source of generation or a ring main system, there is flow of fault current and load current in both directions. The relays used in protection schemes of such a system are thus subjected to fault currents flowing in both directions hence combination of directional and non-directional overcurrent relays is required to be placed at appropriate positions in such protection schemes.

The directional relays will have their tripping direction away from the respective bus. The actual operating time for each directional and non directional relay is decided by considering the operating time of preceding relay, operating time of circuit breaker associated with preceding relay and the overshoot time of the relay which is under consideration.

With non directional overcurrent relays being used in such systems, coordination in relays is required between the relays which are located at the remote end of the line along with the relays behind them.

With the above mentioned concept kept in view for coordination between the relays, the optimization problem can be formulated which can be solved by linear programming technique [8].

Thus for distribution networks with combined overhead lines-underground cables, designing the optimum relay coordination scheme using directional overcurrent relays can be considered as a constrained optimization problem which are solved as linear programming problem with constraints. Many methods like simplex; dual simplex or two phase simplex technique can be used to solve such problems.

In this paper IEEE 13 bus radial distribution test feeder is considered for optimum relay coordination between primary and backup directional overcurrent relays. This test feeder offers variety of interesting features. The operating voltage is 4.16 kV. The nodes are separated with moderate distances with adequate load. Thirteen nodes are interconnected through ten overhead and two underground line sections which constitutes a combined overhead/cable distribution system. Feeder consists of a voltage regulator, a 115/4.16 kV ∆-Y transformer, 4.16/0.480 kV Y-Y step down transformer is interconnected. Loads are unbalanced with changing phasing configuration between nodes. It also incorporates eight unbalanced spot loads and two distributed loads.

The model is simulated in MATLAB without voltage regulator and distributed loads for further analysis.

The directional over current relays are considered in protection scheme as load and fault current will flow in only one direction due to single source generation.

As many protection schemes use only over current relay protection schemes, this paper investigates the variations in calculated and optimum TMS values of over current relays if underground cables are interconnected. The underground cables have different characteristics when compared with overhead lines like high capacitance and high charging current. The effect on variations in relay settings due to combined distribution system is presented in results section at the end.

2 Coordination of overcurrent relays in radial power system

As soon as shunt fault occurs on a power system it is sensed by both primary and backup relays. The primary protection relay will operate first because its operating time is set lesser than that of the backup protection relay.

Figure 1 shows single line diagram of IEEE 13 bus distribution test feeder. As only one generation source is present this system it can be considered as a radial distribution system.

Fig. 1
figure 1

Relay coordination diagram

If fault occurs at point A on load at bus 646, primary relay R1 will operate first. Let the operating time of R1 is set to 0.1 s. If primary relay R1 fails to operate, back up relay operates after 0.1 s.The backup relay R2 will operate after a delay of time duration of 0.1 s and the time duration equal to the operating time of circuit breaker (CB) at bus 646 and the overshoot time of relay R1. This delay in operation of both the relays is required for maintaining the selectivity between relays R1 and R2.

Similarly relay R3 will act as backup relay for R2. Overall relay coordination scheme for the entire distribution system as indicated in Fig. 1 is represented in Table 1.

Table 1 Primary and Backup Relay Pairs

3 Relay coordination problems

Two types of settings can be done in directional overcurrent relays which are time multiplier setting (TMS) and pickup current setting (Ipu).The directional over current relays needs to be set for continuous TMS and discrete pickup current setting. If pickup current of relay is considered as a fixed parameter, problem is considered as a linear programming problem and it is solved for finding optimum time multiplier setting (TMS) of directional overcurrent relay [10]. In general the relay coordination problem using directional over current relays in power system is stated as [10,11,12,13]:

$$ \operatorname{Minimize}\ \Sigma {Wi}^{\ast }\ Tik $$
(1)

Where:

Wi- A coefficient which is generally set to 1.

Tik- Operation time for relay Ri when fault occurs in kth zone in the power system [10,11,12,13,14].

Therefore directional overcurrent relay coordination problem in electrical distribution systems can be considered as an optimization problem, in which sum of operating times of all relays in system is to be minimized under the given values of constraints [11, 12]:

Coordination criteria

$$ Tnk- Tik\ge \bullet T $$
(2)

Where:

Tnk- Time required for operation of first backup relay Ri if a fault occurs in kth zone of power system.

•T- Time interval for coordination between primary and back up relays.

This duration is required for maintaining proper selectivity between primary and backup relays. Coordination time interval between two relays has value 0.5 s [1].

Bounds on the settings

$$ {TMSi}_{min}\le TMSi\le {TMSi}_{max} $$
(3)
$$ {Ti}_{min}\le Ti\le {Ti}_{max} $$
(4)

Where:

TMSi- Time multiplier setting of relay Ri

Ti- Operating time of relay Ri

Relay characteristics

Assuming that all relays are identical and have normal IDMT characteristics, the equation for operating time of relay is given by [10,11,12,13,14]:

$$ Ti=\uplambda \ast \frac{(TMSi)}{\left[{\left(\frac{I}{Is}\right)}^{\upgamma}\kern0.5em -1\right]} $$
(5)

Where:

I - Input current

Is- Setting current.

For normal IDMT relay characteristics,

λ- A constant with value taken as 0.14

γ - A constant with value taken as 0.02 [1].

As the values of pickup currents for all relays are obtained using data from system, Eq. (5) becomes

$$ Ti=\left({\alpha i}^{\ast } TMSi\right) $$
(6)

Where:

$$ \alpha i\ \mathrm{is}\frac{\uplambda}{\left[{\left(\frac{I}{Is}\right)}^{\upgamma}-1\right]} $$

In general, the equation for operating time for normal IDMT relay can be expressed as:

$$ TR=\frac{\left(0.14\ast TMS\right)}{\left[{(PSM)}^{0.02}\kern0.75em -1\right]} $$

Where:

$$ PSM=\frac{I}{Is} $$

Now by substituting the value of Ti obtained from Eq. (6) in Eq. (1), the objective function for optimization becomes

$$ \operatorname{Minimize}\ \Sigma\ \left({\alpha i}^{\ast }\ TMSi\right) $$
(7)

Where αi is known and values of TMSi can be determined by using any one of the LPP method. In this paper dual simplex method is used for optimizing the problem.

Integration with renewable energy sources is essential for economical operation of power grids. However, such integration, changes the load flow in the network which may affect the overcurrent (OC) relays settings. Due to increased flow of the current through lines with such energy sources will result in operation of OC relays even during normal conditions of the network. Also, proper OC relay setting becomes difficult as the generation of renewables depends on the weather conditions. It is observed that integration of Photo voltaic (PV) sources makes OC relays to operate without intention due to changes in magnitude and/or direction of current through the relays [15].

To handle such problem in the networks, two strategies are commonly adopted. In first strategy, renewable generation is disconnected from the network on occurrence of fault. The second strategy permits such energy sources to remain connected even if fault occurs. Both the strategies are based upon standards developed by IEC and IEEE. As per the IEEE 1547–2003 Standard: Interconnecting Distributed Resources with Electric Power Systems, Distributed Generations(DG) are required to be disconnected immediately when a fault occurs in the distribution networks. According to second strategy, the DG is enabled with Fault Ride Through capability (FRT) to avoid disconnection due to occurrence of faults in the network. FRT is achieved by delaying the tripping time of the protection devices with the only intention of avoiding unnecessary disconnection of DG sources by riding through the very short time interval of disturbances. For DG of PV type, FRT capability varies from country to country. In most of the countries, allowable short duration of faults is not more than 150 milliseconds [16].

4 The dual simplex method

Developed by Lemke, dual simplex method is a variant of regular simplex method for solving Linear Programming Problems. Dual simplex method starts with infeasible solution and converges to the primal solution. Number of iterations is required to obtain the solution. The solution thus obtained is feasible as well as optimal at some stage [17, 18]. Two important characteristics of this method are:

  1. i)

    Phase-I calculations are not required as in case of two phase simplex method. This is quite advantageous, because the starting point obtained at the end of phase-I, need not be essentially near the optimal point.

  2. ii)

    Less number of iterations is required to achieve optimum solution as this method works simultaneously for finding feasible as well as optimum solution.

5 Formulation of objective function for optimization

In real power distribution networks, the topology of network may become uncertain due to contingencies arising out of outage of a single-line, maintenance work, and reconfigurations of network. Due to these changes in the topology of network, problem of miscoordination of directional overcurrent relays may arise. These dynamic changes in the topology of network can be incorporated by coordinating every primary/backup relay pair of directional overcurrent relays considering proper linear approximations with the constraints or including a set of inequality coordination constraints, associated with different network topologies [19, 20].

This paper intends to find the effect on relay settings due to underground cables for a mixed overhead/underground distribution system, hence other factors like integration with renewables and change of topology are not taken into consideration.

Objective function for LPP is formulated in three steps:

  • Step1: Identify relays acting as primary relay and back up relay for the loads.

    Table 1 represents relay coordination for the test feeder.

  • Step2: Find the values of maximum fault current and maximum load current for the loads.

    These values are obtained from test feeder simulated in MATLAB simulink. The maximum value of fault current is obtained by simulating L-L-L fault on each load.

  • Step3: Find values of CT ratio, plug settings and time multiplier settings (TMS) for each relay.

Table 2 represents various parameters calculated for formulation of objective function like maximum fault current, maximum load current, CT Ratio, Plug setting and Time multiplier settings values for each relay (Additional file 1).

Table 2 Calculated parameters for formulation of objective function

Referring to eq. (7) objective function of LPP can be stated as:

$$ \operatorname{Minimize}\ \mathrm{Z}=0.{1\mathrm{X}}_1+0.34{\mathrm{X}}_2+0.{4\mathrm{X}}_3+0.{1\mathrm{X}}_4+0.{2\mathrm{X}}_5+0.{1\mathrm{X}}_6+0.24{\mathrm{X}}_7+0.{1\mathrm{X}}_8+0.43{\mathrm{X}}_9+0.34{\mathrm{X}}_{10}+0.31{\mathrm{X}}_{11}+0.{1\mathrm{X}}_{12} $$

Where X1, X2, X3, X4, X5, X6, X7, X8, X9, X10, X11, X12 are time multiplier settings for relays 1 to 12

Subject to constraints:

  1. (1)

    0.34X2–0.1X1 ≥ 0.5

  2. (2)

    0.4X3–0.34X2 ≥ 0.5

  3. (3)

    0.2X5–0.1X4 ≥ 0.5

  4. (4)

    0.24X7–0.1X6 ≥ 0.5

  5. (5)

    0.24X7–0.1 × 8 ≥ 0.5

  6. (6)

    0.34X10–0.43X9 ≥ 0.5

  7. (7)

    0.43X9–0.31X11 ≥ 0.5

  8. (8)

    0.31X11–0.1X12 ≥ 0.5

Extensive simulations are carried in MATLAB simulink to obtain maximum fault current, maximum load current from simulated model of IEEE 13 bus distribution test feeder. The maximum fault current is obtained by simulating L-L-L fault at each load. These values are required for calculating CT ratio, Plug setting and time multiplier settings for each relay.

6 Results

Keeping plug setting constant, the optimization problem becomes Linear Programming Problem. The LPP are generally solved by using MATLAB. Using dual simplex algorithm as a tool in MATLAB the optimum values are obtained for Time multiplier settings of the objective function.

Table 3 represents calculated TMS values and optimum TMS values for each relay in test system.

Table 3 Calculated and Optimum TMS Values

In Table 3 above, Positive sign of column 4 indicates optimum value of TMS is greater than calculated value whereas the negative sign indicates optimum value of TMS is smaller than calculated value.

Positive sign of column 5 indicates % variation of difference on positive side with respect to calculated TMS value where as negative sign indicates % variation on negative side with respect to calculated TMS value.

Difference is calculated as:

Difference = (Optimum –Calculated) TMS value

Difference is expressed as percentage variation of optimum TMS from calculated TMS.

The results prominently shows effectiveness of Linear Programming optimization for designing an optimum protection scheme for radial distribution systems using directional overcurrent relays.

7 Conclusion

Results indicate that optimum Time Multiplier Settings vary in the range – 94.9% to + 52.6%.The variations for all relays is shown in Table 3.

The highest variation on negative side is observed for relay R11 amounting – 94.9%.

Relay R11 is provides primary protection for the load connected at bus 692 if fault occurs at point (G) while it is provides back up protection for load connected at bus 675 if fault occurs at point (H) connected through underground cable.

Similarly highest variation on positive side is observed for relays R6 and R8 amounting 52.6%.

Relay R6 provides primary protection for load connected at bus 611 if fault occurs at point (D). The relay R8 provides primary protection for load connected at bus 652 if fault occurs at point (E) connected through underground cable.

It is prominent that maximum variation in TMS is found when underground cable and over head lines are combined. The combined cable/overhead lines raise many issues on protection scheme due to high charging current and capacitance of underground cables. With increased capacitance the charging current also increases, which may be as high as significant fraction of the load current. This imposes limitations on minimum relays settings. Also high current transients are produced due to energization and de-energization of cable circuit which are similar to fault currents of external protection zone of the underground cable. The protection schemes should be able to cope with these transient currents, to ensure the reliability and security of protection scheme [9].

For these reasons, the protection schemes implemented for over head lines differs in principle than the protection systems implemented for underground cables [21]..

Hence it is concluded that Linear Programming optimization using dual simplex method provides an efficient tool for relay coordination problem in radial distribution systems using directional over current relays. With the use of optimized protection scheme, proper relay coordination can be achieved between primary and back up relays to avoid malfunctioning of relays which is needed to avoid unwanted outage of healthy part of the system.

References

  1. Paithankar, Y. G., & Bhide, S. R. (2007). Fundamentals of power system protection. New Delhi: Prentice Hall of India Private Limited.

    Google Scholar 

  2. Ram, B., & Vishwakarma, D. N. (2008). Power System Protection and Switchgear. New Delhi: Tata McGraw Hill Publishing Company Limited.

    Google Scholar 

  3. Mason, C. R. (1995) The art and science of protective relaying. New York: Wiley.

  4. So, C. W., & Lee, K. K. (2000). Overcurrent relay coordination by evolutionary programming. Electric Power System Research, 53(2), 83–90.

    Article  Google Scholar 

  5. So C.W., Lee K. K., Lai K.T., and Fung Y. K. (1997), Application of genetic algorithm to overcurrent relay grading coordination, Fourth International Conference on Advances in Power System Control, Operation and Maintenance, APSCOM-97, Hong Kong, pp. 283–287.

  6. Singh, M., Panighahi, B. K., & Abhyankar, A. R. (2013). Optimal coordination of directional overcurrent relays using teaching learning-based optimization (TLBO) algorithm. International Journal of Electrical power & Energy Systems, 50, 33–41.

    Article  Google Scholar 

  7. Hussaina, M. H., Rahima, S. R. A., & Musirin, I. (2013). Optimal overcurrent relay coordination: A review, Procedia Engineering. SciVerse Science Direct, 53, 332–336.

    Google Scholar 

  8. Prashant P. Bedekar, Sudhir R. Bhide, and Vijay S. Kale(2009),Coordination of overcurrent relays in distribution system using linear programming technique, IEEE International coference on Control, Automation, Communication and Energy Conservation, pp1–4.

  9. D. A. Tziouvaras, J. Needs (2014), Protection of mixed overhead and underground cable lines, 12th International Conference on Developments in Power System Protection Copenhagen, Denmark, doi:https://doi.org/10.1049/cp.2014.0132.

  10. Zeienldin H., El-Saadany and Salama M.A. (2004), A novel problem formulation for directional overcurrent relay coordination,” IEEE International Conference, pp48–52.

  11. Urdaneta, A. J., Ramon, N., & Jimenez, L. G. P. (1988). Optimal coordination of directional relays in interconnected power system. IEEE Transactions on Power Delivery, 3(3), 903–911.

    Article  Google Scholar 

  12. Urdaneta, A. J., Restrepo, H., Marquez, S., & Sanchez, J. (1996). Coordination of directional relay timing using linear programming. IEEE Transactions on Power Delivery, 11(1), 122–129.

    Article  Google Scholar 

  13. Chattopadhyay, B., Sachdev, M. S., & Sidhu, T. S. (1996). An online relay coordination algorithm for adaptive protection using linear programming technique. IEEE Trans on Power Delivery, 11(1), 165–173.

    Article  Google Scholar 

  14. Abhyaneh, H. A., Al-Dabbagh, M., Karegar, H. K., Sadeghi, S. H. H., & Khan, R. A. J. (2003). A new optimal approach for coordination of directional over current relays in interconnected power system. IEEE Transactions on Power Delivery, 18(2), 430–435.

    Article  Google Scholar 

  15. Meskin, M., Iyer, P., & Domijan, A. (2017). Impact of PV sources on the overcurrent relays in medium voltage distribution networks. In Nineth Annual IEEE Green Technologies Conference (Vol. 1, pp. 271–275).

    Google Scholar 

  16. Norshahrani, M., Mokhlis, H., Halim, A., Bakar, A., Jamian, J., & Sukumar, S. (2017). Progress on protection strategies to mitigate the impact of renewable distributed generation on distribution systems. Energies. https://doi.org/10.3390/en10111864.

    Article  Google Scholar 

  17. Sankara Iyer, P. (2009). Operations research. New Delhi: Tata McGraw Hill Publishing Company Limited.

    Google Scholar 

  18. Sharma, J. K. (2009). Operations research – Theory and applications. New Delhi: Macmillan India Limited.

    Google Scholar 

  19. Urdaneta, A. J., Perez, L. G., & Restrepo, H. (1997). Optimal coordination of directional overcurrent relays considering dynamic changes in the network topology. IEEE Transactions on Power Delivery, 12(4), 1458–1464.

    Article  Google Scholar 

  20. Noghabi, A. S., Mashhadi, H. R., & Sadeh, J. (2010). Optimal coordination of directional overcurrent relays considering different network topologies using interval linear programming. IEEE Transactions on Power Delivery, 25, 1348–1354.

    Article  Google Scholar 

  21. R. Granizo; F. Alvarez; C. A. Platero; M. Redondo (2017), Novel protection method for ground faults detection in cables used in combined overhead-cable lines in power systems, IEEE International Conference on Environment and Electrical Engineering and IEEE Industrial and Commercial Power Systems Europe(EEEIC/I & CPS Europe)-2017,doi: https://doi.org/10.1109/EEEIC.2017.7977492

Download references

Acknowledgements

Not Applicable.

Funding

No funding is received from any funding agency for this research work.

Availability of data and materials

The data for IEEE 13 bus test feeder is referred from standard test system published by IEEE POWER ENGINEERING SOCIETY, Distribution System Analysis Subcommittee, available publically on internet.

About the Authors

Mr. Sarang V Khond is Research Scholar pursuing his PhD in Electrical Engg. from Govt. Engineering College, Chandrapur (M.S.), India. Born on May 16, 1972, he graduated (1993) and post graduated (2010) in Electrical Engg. from Govt. College of Engineering Amravati. With more than 25 years of professional and academic experience, he is associated with HVP Mandal’s College of Engineering from last 16 years as Associate Professor in Electrical Engg. His areas of interest include Power system analysis, power system protection and artificial intelligence.

Dr. Gunwant A Dhomane is Professor in Dept of Electrical Engg., Govt. Engineering College, Chandrapur (M.S.), and India. He was born on April 9, 1963; He graduated in Electrical Engineering from Walchand College of Engineering. He completed his post graduation in Electrical Power Systems from Govt. Engineering College, Amravati in 1995. He has published 20 papers in national and international journals and conferences. He has completed his PhD from VNIT, Nagpur. His areas of interest include Power electronics, power system protection, and power systems.

Author information

Authors and Affiliations

Authors

Contributions

SVK carried out problem formulation, simulation, calculations, preparing manuscript, GAD participated in problem conceptualization, coordination and helped to draft manuscript. Both authors read and approved the final manuscript.

Corresponding author

Correspondence to Sarang V. Khond.

Ethics declarations

Competing interests

The authors declare that they have no competing interests.

Additional file

Additional file 1:

Sample calculation for CT Ratio, Plug setting and TMS for Primary relay R1 and backup relay R2 for loads at bus 646 and 645. (DOCX 13 kb)

Rights and permissions

Open Access This article is distributed under the terms of the Creative Commons Attribution 4.0 International License (http://creativecommons.org/licenses/by/4.0/), which permits unrestricted use, distribution, and reproduction in any medium, provided you give appropriate credit to the original author(s) and the source, provide a link to the Creative Commons license, and indicate if changes were made.

Reprints and permissions

About this article

Check for updates. Verify currency and authenticity via CrossMark

Cite this article

Khond, S.V., Dhomane, G.A. Optimum coordination of directional overcurrent relays for combined overhead/cable distribution system with linear programming technique. Prot Control Mod Power Syst 4, 9 (2019). https://doi.org/10.1186/s41601-019-0124-6

Download citation

  • Received:

  • Accepted:

  • Published:

  • DOI: https://doi.org/10.1186/s41601-019-0124-6

Keywords