Table 3 The optimal distribution system expansion option of the DSO

From: Bi-level stackelberg game-based distribution system expansion planning model considering long-term renewable energy contracts

Network assets

Case1

Case 2

Case3

Substation

S2 (13.3)

S1 (16.7)

S3(22.2)

S4 (22.2)

S4 (22.2)

S4(22.2)

Existing line

51–1 (A4)

51–1 (A4)

51–1 (A4)

51–3 (A3)

51–3 (A3)

51–3 (A3)

3–4 (A3)

3–4 (A3)

3–4 (A3)

4–7 (A2)

4–7 (A2)

4–7 (A2)

4–5 (A2)

7–8 (A2)

7–8 (A2)

7–8 (A2)

1–9 (A2)

1–9 (A2)

1–9 (A2)

52–14 (A2)

52–14 (A2)

52–14 (A5)

14–15 (A2)

14–15 (A2)

14–15 (A3)

52–11 (A3)

52–11 (A3)

15–16 (A3)

11–12 (A3)

11–12 (A3)

52–11 (A4)

  

11–12 (A3)

  

New line

19–20 (A1)

19–20 (A1)

19–20 (A1)

18–19 (A2)

18–19 (A1)

18–19 (A1)

18–17 (A3)

18–17 (A1)

18–17 (A3)

21–18 (A5)

21–18 (A3)

21–18 (A5)

54–21 (A4)

54–21 (A5)

54–21 (A3)

54–22 (A5)

54–22 (A5)

54–22 (A3)

23–22 (A2)

23–22 (A3)

23–22 (A5)

24–23 (A4)

24–23 (A4)

24–23 (A5)

25–24 (A2)

25–24 (A5)

25–24 (A4)

26–27 (A1)

26–27 (A2)

26–27 (A1)

28–27 (A2)

28–27 (A3)

28–27 (A4)

54–30 (A5)

54–30 (A4)

54–30 (A4)

29–30 (A1)

29–30 (A3)

29–30 (A3)

43–30 (A5)

43–30 (A2)

43–30 (A2)

37–43 (A1)

37–43 (A1)

37–43 (A1)

31–37 (A1)

31–37 (A1)

31–37 (A1)

45–12 (A3)

45–12 (A2)

45–12 (A2)

44–45 (A2)

44–45 (A2)

44–45 (A2)

38–44 (A2)

38–44 (A2)

38–44 (A2)

39–38 (A1)

39–38 (A1)

39–38 (A1)

32–39 (A1)

32–39 (A1)

32–39 (A1)

33–34 (A1)

35–34 (A1)

35–34 (A1)

36–35 (A1)

36–35 (A1)

36–35 (A1)

53–36 (A1)

53–36 (A1)

53–36 (A1)

53–28 (A1)

53–28 (A2)

53–28 (A2)

53–41 (A1)

53–41 (A2)

53–41 (A2)

40–41 (A2)

40–41 (A1)

40–41 (A1)

16–40 (A2)

42–41 (A1)

42–41 (A2)

48–42 (A1)

48–42 (A1)

48–42 (A1)

49–48 (A1)

49–48 (A1)

49–48 (A1)

50–49 (A1)

50–49 (A1)

50–49 (A1)

47–42(A1)

47–42(A1)

47–42(A1)

46–47 (A2)

14–46 (A1)

14–46 (A1)

14–46 (A2)