Skip to main content

Table 2 Parameters of the candidate RDGs

From: Bi-level stackelberg game-based distribution system expansion planning model considering long-term renewable energy contracts

DG

Capacity (MW)

Cost (104$)

CFD electricity of each unit during 24 h (MWh)

WTG

0.1

20

0.78

PV

0.2

40

1.52