From: Bi-level stackelberg game-based distribution system expansion planning model considering long-term renewable energy contracts
Line type
R (Ω)
X (Ω)
Current limit (A)
Cost (104$)
A1
0.85
0.4
150
12.4
A2
0.45
0.35
275
16
A3
0.24
0.32
450
23
A4
0.13
0.12
600
30.2
A5
0.08
0.06
800
38