Skip to main content

Table 1 Parameters of the candidate lines

From: Bi-level stackelberg game-based distribution system expansion planning model considering long-term renewable energy contracts

Line type

R (Ω)

X (Ω)

Current limit (A)

Cost (104$)

A1

0.85

0.4

150

12.4

A2

0.45

0.35

275

16

A3

0.24

0.32

450

23

A4

0.13

0.12

600

30.2

A5

0.08

0.06

800

38