Skip to main content

Table 4 Four different control schemes

From: Tracking-dispatch of a combined wind-storage system based on model predictive control and two-layer fuzzy control strategy

Control scheme

Setup mode

Principle of optimization

Scheme 1

α = 0

The tracking plan has the smallest deviation

Scheme 2

α = 1

The deviation of the residual capacity of ESS from the ideal value is minimal

Scheme 3

MPC method for minimum output of ESS

Scheme 4

Dynamic adjustment α、∆k

The optimization method proposed in this paper