Skip to main content

Table 3 Simulation parameters

From: Tracking-dispatch of a combined wind-storage system based on model predictive control and two-layer fuzzy control strategy

parameters

Symbol

Value & Units

Installed capacity of wind farms

Cinstall

50 MW

Cycle of control

Tc

5 min

Rated capacity of ESS

Crated

20 MW·h

Rated power of ESS

Prated

10 MW

The deviation band sets the coefficient

\(\delta\)

0.2

Sampling time

Ts

5 min

Upper limit of ESS state of charge

ESOC.max

0.85

Lower bound of ESS state of charge

ESOC.min

0.15