Skip to main content

Table 4 Cost comparison of IES in different scenarios

From: Two-stage distributionally robust optimization-based coordinated scheduling of integrated energy system with electricity-hydrogen hybrid energy storage

 

Carbon trading cost ($)

Operational cost ($)

Maintenance cost ($)

Total cost ($)

Scenario 1

856.83

4397.81

534.21

5788.85

Scenario 2

802.58

4062.94

597.33

5462.85