From: Hierarchical under frequency load shedding scheme for inter-connected power systems
Area | \(\eta_{j}\) (%) | Load | \(\beta_{li}\) (%) | \(\delta P_{li}\) (MW) |
---|---|---|---|---|
Area1 | 19 | 4 | 51 | 46.51 |
8 | 49 | 44.69 | ||
Area2 | 52 | 15 | 0.64 | 1.61 |
20 | 83.33 | 210.25 | ||
21 | 16.03 | 40.44 | ||
Area3 | 29 | 3 | 38.43 | 54.46 |
25 | 15.22 | 21.56 | ||
29 | 46.35 | 65.68 |