Skip to main content

Table 1 The proportion of the PE and LSA of each area and load under loss of generator G3

From: Hierarchical under frequency load shedding scheme for inter-connected power systems

Area

\(\eta_{j}\) (%)

Load

\(\beta_{li}\) (%)

\(\delta P_{li}\) (MW)

Area1

19

4

51

46.51

  

8

49

44.69

Area2

52

15

0.64

1.61

  

20

83.33

210.25

  

21

16.03

40.44

Area3

29

3

38.43

54.46

  

25

15.22

21.56

  

29

46.35

65.68