Skip to main content

Table 13 Contingency ranking and analysis of the IEEE 118-bus system with two generator outages and pre-specified reactive power load at nodes 11, 20, 30, 33, 51, 75 and 96

From: A novel collapse prediction index for voltage stability analysis and contingency ranking in power systems

Pre-specified reactive power load: Q11 = 872 MVAr, Q20 = 115, Q30 = 700 MVAr, Q33 = 150MVAr, Q51 = 165 MVAr, Q75 = 550MVAr, and Q96 = 343 MVAr

Generator outages

(N-2)

The rank of generator outages

Rank of lines

Most stressed lines (from–to)

NCPI

Lmn

FVSI

LQP

NLSI

VSLI

Gen. 8

Gen. 74

1

1

75–69

0.8599

0.8344

0.7755

0.6047

0.8607

0.8635

 

2

75–70

0.7939

0.7620

0.7933

0.7257

0.7219

0.7296

 

3

30–26

0.7534

0.6889

0.6375

0.5087

0.6947

0.6945

Gen. 76

Gen. 99

2

1

75–69

0.7290

0.6846

0.6278

0.4769

0.7359

0.7460

 

2

75–77

0.7116

0.6847

0.7112

0.6522

0.6402

0.6409

 

3

30–26

0.7014

0.6275

0.5805

0.4482

0.6396

0.6398

Gen. 15

Gen. 19

3

1

30–26

0.7208

0.6498

0.6010

0.4690

0.6596

0.6605

 

2

75–69

0.6666

0.6392

0.5852

0.4411

0.6977

0.7094

 

3

33–37

0.6240

0.6156

0.6179

0.5610

0.6113

0.6045

Gen. 54

Gen. 56

4

1

30–26

0.7016

0.6272

0.5801

0.4472

0.6394

0.6401

 

2

75–69

0.6671

0.6401

0.5865

0.4432

0.6980

0.7091

 

3

51–49

0.6148

0.6017

0.5825

0.4833

0.6306

0.6293