Skip to main content

Table 2 Parameters of wind and PV generators and EVs in the 118-bus distribution system

From: Reactive power optimization of a distribution network with high-penetration of wind and solar renewable energy and electric vehicles

Number

Wind speed

(m s−1)

Solar irradiation

(W m−2)

Active power

(kW)

Reactive capacity

(\(\mathrm{kVar}\))

PV equipment

1

 

350

7.00

[− 21.91,21.91]

2

 

450

9.00

[− 21.17,21.17]

3

 

550

11.00

[− 20.20,20.20]

4

 

650

13.00

[− 18.97,18.97]

5

 

750

15.00

[− 17.44,17.44]

6

 

850

17.00

[− 15.49,15.49]

7

 

950

19.00

[− 12.96,12.96]

8

 

1050

21.00

[− 9.38,9.38]

Wind power generation

1

9

 

200.00

[− 136.60,151.11]

2

11

 

266.67

[− 92.13,121.48]

3

13

 

300.00

[− 69.90,106.67]

4

15

 

300.00

[− 69.90,106.67]

5

17

 

300.00

[− 69.90,106.67]

6

19

 

300.00

[− 69.90,106.67]

EV charging and battery change station

1

  

 − 52.03

[− 60.77,60.77]

2

  

 − 38.09

[− 70.35,70.35]

3

  

 − 58.54

[− 54.52,54.52]

4

  

 − 29.22

[− 74.47,74.47]

5

  

64.20

[− 47.74,47.74]

6

  

 − 58.44

[− 54.64,54.64]