Skip to main content

Table 3 Comparison of optimal objective function values for the IEEE 119-bus system

From: Resilient outage recovery of a distribution system: co-optimizing mobile power sources with network structure

Objective

Power outage time

Routing cost of MPS

Power generation cost of MPS

The number of switch action

Power losses

Only dispatching MPS

107.51 min

1493.23 CNY

3167.43 CNY

0

334.38 kW

Only performing network reconfiguration

0

0

0

11

1370.98 kW

Without considering power losses

0

0

0

11

1687.80 kW

Resilient outage recovery method

25.27 min

350.93 CNY

36.19 CNY

10

824.96 kW