Table 2 List of case setting

From: Model and application of renewable energy accommodation capacity calculation considering utilization level of inter-provincial tie-line

Scheme Power side Grid side load side
Minimum technical output Provincial channel Inter-provincial channel Inter-regional channel Total social electricity accommodation (TWh)
1 Curve constraint Curve constraint Curve constraint 7100
2 Stability constraint Electricity constraint Curve constraint 7100
3 Stability constraint Stability constraint Electricity constraint 7100
4 Stability constraint Stability constraint Stability constraint 7100