Scheme | Power side | Grid side | load side | ||
---|---|---|---|---|---|
Minimum technical output | Provincial channel | Inter-provincial channel | Inter-regional channel | Total social electricity accommodation (TWh) | |
1 | √ | Curve constraint | Curve constraint | Curve constraint | 7100 |
2 | √ | Stability constraint | Electricity constraint | Curve constraint | 7100 |
3 | √ | Stability constraint | Stability constraint | Electricity constraint | 7100 |
4 | √ | Stability constraint | Stability constraint | Stability constraint | 7100 |