From: Parallel computing of multi-contingency optimal power flow with transient stability constraints
Contingency Line | Integration Step(s) | Iterations | Objective Function | Computation Time(s) |
---|---|---|---|---|
Branch 5–1 | 0.01 | 17 | 233.6095 | 1.27 |
0.02 | 16 | 233.6092 | 0.94 | |
Branch 97–96 | 0.01 | 29 | 233.6556 | 8.74 |
0.02 | 26 | 233.6537 | 3.85 |