Skip to main content

Table 1 Summary of the three test cases

From: Parallel computing of multi-contingency optimal power flow with transient stability constraints

Cases

Number of Generators/Buses/Lines

Objective Function of Conventional OPF

Iterations of Conventional OPF

Computation Time(s)

NE39

10/39/34

61.8135

12

0.04

IEEE300

69/300/304

233.6095

17

0.28

C703

99/703/800

130.5660

18

0.57