Table 2 Sizing ESS with PtG

From: Coordination of battery energy storage and power-to-gas in distribution systems

Total Price Paid for Imported Power Whole Period [$]
 No Storage Surplus Power and Price Method
 4,03E + 05 4,33E + 05
Total Size of the Storage System with PtG [MWh]
 No Storage Surplus Power and Price Method
 0 5,76E + 02
Gas Produced entire period [m^3]
 No Storage Surplus Power and Price Method
 0 7,03E + 04
Highest Charge Rate [MW/interval]
 No Storage Surplus Power and Price Method
 0 1,94E + 01
Highest Discharge Rate [MW/interval]
 No Storage Surplus Power and Price Method
 0 1,32E + 01