Skip to main content

Table 2 Simulation results for test system 2

From: Review on application and comparison of metaheuristic techniques to multi-area economic dispatch problem

Power (MW) DE SA EP RCGA
  Fuel   Fuel   Fuel   Fuel
Ρ 1,1 (MW) 225.9431 2 228.1730 2 223.8491 2 239.0958 2
Ρ 1,2 (MW) 211.1594 1 213.3402 1 209.5759 1 216.1166 1
Ρ 1,3 (MW) 489.9216 2 482.8722 2 496.0680 2 484.1506 2
Ρ 1,4 (MW) 240.6232 3 242.6425 3 237.9954 3 240.6228 3
Ρ 2,1 (MW) 254.0397 1 253.5059 1 259.4299 1 259.6639 1
Ρ 2,2 (MW) 235.4927 3 236.5760 3 228.9422 3 219.9107 3
Ρ 2,3 (MW) 263.8837 1 266.6356 1 264.1133 1 254.5140 1
Ρ 3,1 (MW) 237.0006 3 234.3130 3 238.2280 3 231.3565 3
Ρ 3,2 (MW) 328.7373 1 325.9516 1 331.2982 1 341.9624 1
Ρ 3,3 (MW) 248.8607 1 251.4034 1 246.6025 1 248.2782 1
Τ 21 (MW) 99.8288 100 100 93.1700
Τ 31 (MW) 99.7334 99.8797 100 93.8739
Τ 32 (MW) 31.2615 28.1853 32.5231 43.7824
Ρ L1 (MW) 17.2095 16.9000 17.4884 17.0297
Ρ L2 (MW) 9.8488 9.9028 10.0085 9.7010
Ρ L3 (MW) 8.6037 8.6030 8.6056 8.9408
Cost ($/h) 653.9995 654.0916 655.1716 657.3325
CPU time (second) 95.0351 10.0156 108.0625 133.8438