Skip to main content

Table 1 Simulation results for test system 1

From: Review on application and comparison of metaheuristic techniques to multi-area economic dispatch problem

  DE SA EP RCGA
Ρ 1,1 (MW) 500.0000 500.0000 500.0000 500.0000
Ρ 1,2 (MW) 200.0000 200.0000 200.0000 200.0000
Ρ 1,3 (MW) 150.0000 150.0000 149.9919 149.6328
Ρ 2,1 (MW) 204.3341 204.2157 206.4493 205.9398
Ρ 2,2 (MW) 154.7048 155.0575 154.8892 155.8322
Ρ 2,3 (MW) 67.5770 67.3516 65.2717 65.2209
Τ 12 (MW) 82.7731 82.7731 82.7652 82.4135
Ρ L1 (MW) 9.4269 9.4269 9.4267 9.4193
Ρ L2 (MW) 4.1890 4.1979 4.1754 4.2064
Cost ($/h) 12255.39 12255.39 12255.43 12256.23
CPU time (second) 17.6875 14.7656 21.3281 24.2031