Table 3 Optimal solutions compared between deterministic and fuzzy chance-constrained model

From: Optimal scheduling strategy for virtual power plants based on credibility theory

Cost/$ α = 0.6 α = 0.7 α = 0.8 α = 0.9 Deterministic model
Start-up cost of units 400 400 200 161 387
Operation cost 143,380 144,681 144,280 144,341 144,300
Cost of curtailing load 2253 934 1644 1620 2333
Total cost 146,033 146,015 146,124 146,122 147,020