Skip to main content

Table 11 Contingency ranking and analysis of the IEEE 30-bus system with pre-specified reactive power load at (a) buses 4, 7, 9, 16 and 20, (b) nodes 4 and 16, (c) nodes 7 and 28

From: A novel collapse prediction index for voltage stability analysis and contingency ranking in power systems

Generator outage

Rank

Most stressed lines

NCPI

Lmn

FVSI

LQP

NLSI

VSLI

(a) Prespecified reactive power load: Q4 = 205 MVAr, Q7 = 187.5 MVAr, Q9 = 145.8 MVAr, Q16 = 65.5 MVAr, Q20 = 50.5 MVAr

Gen. 5

1 (Critical)

8–6

0.9441

0.9429

0.9022

0.8376

0.8108

0.7862

2 (Critical)

9–11

0.9003

0.9003

0.9003

0.9003

0.9003

0.9003

3 (Stressed)

16–12

0.8569

0.7988

0.8530

0.6849

0.7445

0.7575

4

7–6

0.7544

0.7374

0.7468

0.6625

0.7267

0.7260

5

20–10

0.7438

0.7101

0.7371

0.6030

0.6751

0.6799

6

4–2

0.6352

0.6172

0.5829

0.4709

0.6617

0.6684

(b) Prespecified reactive power load: Q4 = 205MVAr, Q16 = 65.5MVAr

Gen. 13

1 (Most stressed)

4–12

0.8565

0.7663

0.7511

0.8565

0.7511

0.2716

2

16–17

0.5193

0.4947

0.5191

0.4386

0.4273

0.4387

3

4–2

0.4616

0.4478

0.4292

0.3564

0.4941

0.4948

4

16–12

0.4511

0.4374

0.4491

0.3641

0.4006

0.4033

(c) Prespecified reactive power load: Q7 = 187.5 MVAr, Q28 = 181.5 MVAr

Gen. 8

1 (Critical)

7–5

0.9497

0.8733

0.9492

0.8180

0.8049

0.8355

2

10–6

0.7839

0.6804

0.6666

0.7839

0.6666

0.7038

3

28–6

0.7142

0.6988

0.7131

0.6575

0.6777

0.6719

4

28–8

0.5989

0.5816

0.5989

0.5436

0.5438

0.5389