| Load nodes | Interruption duration per year due to the faults at B4 |
---|---|---|
Load nodes lying upstream to AR as well as the faulty branch, B4 | 2, 3, 7 | No interruption |
Load node lying downstream to AR but upstream to the faulty branch, B4 | 4 | \(\lambda_{B4} .\delta t_{B4}\) |
Load nodes lying downstream to the faulty branch, B4 as well as AR located at B3 | 5, 6 | \(\lambda_{B4} .\delta p_{B4}\) |