Table 1 Power interruptions caused by a fault at B4 based on Fig. 1a

From: Reliability and efficiency enhancement of a radial distribution system through value-based auto-recloser placement and network remodelling

 

Load nodes

Interruption duration per year due to the faults at B4

Load nodes lying upstream to the faulty branch, B4

2, 3, 4, 7

\(\lambda_{B4} .\delta t_{B4}\)

Load nodes lying downstream to the faulty branch, B4

5, 6

\(\lambda_{B4} .\delta p_{B4}\)