Result | Stage I | Stage II | Stage III | Stage IV | |
---|---|---|---|---|---|
AC-DC converter (MVA) | |||||
Node 8 | 1.52 | 1.52 | 1.77 | 2.05 | |
Node 21 | 0.02 | 0.48 | 2.08 | 2.13 | |
Node 27 | 0.76 | 0.76 | 1.41 | 5.20 | |
DC-DC converter (MW) | 0.72 | 1.83 | 4.39 | 8.00 | |
Storage battery (MWh) | 2.05 | 5.18 | 16.77 | 45.16 | |
Line construction cost (104RMB) | 13.18 | 13.18 | 13.18 | 13.18 | |
Total investment cost (104RMB) | 146.05 | 180.85 | 307.66 | 692.76 | |
Total cost (104RMB) | 2712.96 | 2636.06 | 2251.12 | 1827.44 |