Table 5 Cost–benefit result in multiple stages

From: Multi-stage expansion planning of energy storage integrated soft open points considering tie-line reconstruction

Annual cost (104RMB)

Electricity purchase cost

Power loss cost

Voltage deviation cost

DG curtailment cost

Total investment cost

Total cost

Stage I

Case I

2556.12

38.79

6.29

2.88

130.24

2695.53

Case II

2730.63

44.93

8.04

38.50

–

2822.10

Stage II

Case I

2440.32

41.56

6.20

9.12

178.29

2633.93

Case II

2628.55

52.09

8.37

36.01

–

2725.02

Stage III

Case I

1936.37

45.34

5.40

2.06

304.37

2248.20

Case II

2485.24

56.23

8.38

80.15

–

2630.00

Stage IV

Case I

1122.13

63.25

4.09

0.98

688.89

1816.09

Case II

2511.90

61.26

8.46

196.30

–

2777.92

Total stages

Case I

8,054.94

188.94

21.98

15.04

1,301.79

9,393.75

Case II

10,356.32

214.51

33.25

350.96

–

10,955.04