Table 2 The comparison of optimal objective function value for the IEEE 33-bus system

From: Resilient outage recovery of a distribution system: co-optimizing mobile power sources with network structure

Objective

Power outage time

Routing cost of MPS

Power generation cost of MPS

The number of switch action

Power losses

Only dispatching MPS

167.66 min

2770.80 CNY

476.25 CNY

0

68.04 kW

Only performing network reconfiguration

0

0

3

504.83 kW

Without considering power losses

34.01 min

944.65 CNY

210.00 CNY

4

543.14 kW

Resilient outage recovery method

34.01 min

944.65 CNY

442.50CNY

3

123.92 kW