Table 1 Basic data of the improved system

From: Bi-level optimization based two-stage market clearing model considering guaranteed accommodation of renewable energy generation

Unit number

Generator type

Accessed bus number

Output upper limit (MW)

Output lower limit (MW)

Upward ramping rate (MWh)

Downward ramping rate (MWh)

Minimum continuous start-up time (h)

Minimum continuous shutdown time (h)

Marginal generation cost (RMB/MW)

G1

Wind power

39

200

0

200

200

0

0

69.76

G2

Wind power

31

300

0

300

300

0

0

39.25

G3

Wind power

32

400

0

400

400

0

0

51.64

G4

Thermal power

34

300

150

100

100

6

6

362.10

G5

Thermal power

35

600

300

120

120

8

8

310.40

G6

Thermal power

36

300

150

80

80

4

4

350.00

G7

Thermal power

37

600

300

160

160

8

8

325.00

G8

Thermal power

38

250

125

60

60

6

6

363.76