Skip to main content

Table 4 Real power estimation of standard IEEE-57 bus system using heuristic pdf method

From: Optimal Location and Sizing of Conglomerate DG- FACTS using an Artificial Neural Network and Heuristic Probability Distribution Methodology for Modern Power System Operations

Line to line

Real power losses (pu)

Line to line

Real power losses (pu)

Line to line

Real power losses (pu)

1–2

0.51

14–15

0.79

41–42

0.86

2–3

0.5

18–19

0.74

41–43

0.67

3–4

0.52

19–20

0.65

38–44

0.66

4–5

0.51

21–20

0.98

15–45

0.66

4–6

0.53

21–22

0.71

14–46

0.87

6–7

0.54

22–23

0.72

46–47

0.87

6–8

0.55

23–24

0.69

47–48

0.75

8–9

0.54

24–25

0.62

48–49

0.58

9–10

0.57

24–26

0.63

49–50

0.71

9–11

0.55

26–27

0.65

50–51

0.87

9–12

0.59

27–28

0.6

10–51

0.8

9–13

0.6

28–29

0.62

13–49

0.81

13–14

0.71

7–29

0.61

29–52

0.82

13–15

0.72

25–30

0.75

52–53

0.85

1–15

0.75

30–31

0.73

53–54

0.84

1–16

0.61

31–32

0.71

54–55

0.87

1–17

0.62

32–33

0.72

11–43

0.84

3–15

0.54

34–32

0.75

44–45

0.72

4–18

0.56

34–35

0.76

40–56

0.72

5–6

0.54

35–36

0.77

56–41

0.75

7–8

0.61

36–37

0.78

56–42

0.65

10–12

0.62

37–38

0.79

39–57

0.57

11–13

0.72

38–39

0.81

57–56

0.58

12–13

0.81

36–40

0.59

38–39

0.57

12–16

0.85

22–38

0.58

38–48

0.59

12–17

0.78

11–41

0.87

9–55

0.66