Skip to main content

Table 16 Power flow comparison with and without presence of TCSC between the buses no. 5 and 6 for IEEE 9- bus system

From: Optimal Location and Sizing of Conglomerate DG- FACTS using an Artificial Neural Network and Heuristic Probability Distribution Methodology for Modern Power System Operations

Bus No

Without TCSC

With TCSC

Heuristic pdf

ANN

P (p.u)

Q (p.u)

P (p.u)

Q (p.u)

P (p.u)

Q (p.u)

5

1.40

1.01

1.25

0.95

0.91

0.78

6

1.03

0.94

1.00

0.82

0.92

0.76