Skip to main content

Table 12 Simulation results using the proposed method

From: Statistical machine learning model for capacitor planning considering uncertainties in photovoltaic power

Item Value
Planning location Buses 7 and 8
Planning capacity [100 kVAr, 100 kVAr]
Lower voltage limit 0.95 p.u
Cost time for FSA 220.2490 s
Cost time for the proposed method 0.6190 s
Objective function for FSA 0.0525 MW,
Objective function for the proposed method 0.0513 MW