Item | Value |
---|---|
Planning location | Buses 7 and 8 |
Planning capacity | [100 kVAr, 100 kVAr] |
Lower voltage limit | 0.95 p.u |
Cost time for FSA | 220.2490 s |
Cost time for the proposed method | 0.6190 s |
Objective function for FSA | 0.0525 MW, |
Objective function for the proposed method | 0.0513 MW |