From: Impact of the penetration of distributed generation on optimal reactive power dispatch
Limits of voltages and tap-settings (p.u.) | |||||||
---|---|---|---|---|---|---|---|
\( {\mathrm{V}}_{\mathrm{g}}^{\mathrm{min}} \) | \( {\mathrm{V}}_{\mathrm{g}}^{\mathrm{max}} \) | \( {\mathrm{V}}_{\mathrm{PQ}}^{\mathrm{min}} \) | \( {\mathrm{V}}_{\mathrm{PQ}}^{\mathrm{max}} \) | Tmin | Tmax | ||
0.9 | 1.1 | 0.94 | 1.06 | 0.9 | 1.1 | ||
Limits of the reactive power sources (p.u.) | |||||||
Bus No. | 5 | 34 | 37 | 44 | 45 | 46 | 48 |
\( {\mathrm{Q}}_{\mathrm{c}}^{\mathrm{min}} \) | −0.4 | 0 | −0.25 | 0 | 0 | 0 | 0 |
\( {\mathrm{Q}}_{\mathrm{c}}^{\mathrm{max}} \) | 0 | 0.14 | 0 | 0.1 | 0.1 | 0.1 | 0.15 |
Bus No. | 74 | 79 | 82 | 83 | 105 | 107 | 110 |
\( {\mathrm{Q}}_{\mathrm{c}}^{\mathrm{min}} \) | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
\( {\mathrm{Q}}_{\mathrm{c}}^{\mathrm{max}} \) | 0.12 | 0.2 | 0.2 | 0.1 | 0.2 | 0.06 | 0.06 |