Table 14 Optimum solution for the IEEE 30 bus system with DG individually injected at each bus using the JAYA algorithm

From: Impact of the penetration of distributed generation on optimal reactive power dispatch

Bus No.

Optimal DG value and Ploss

Bus No.

Optimal DG value and Ploss

Bus No.

Optimal DG value and Ploss

2

DG = 65.135046 MW

Ploss = 4.004 MW

12

DG = 61.407578 MW

Ploss = 3.3274 MW

22

DG = 60.513691 MW

Ploss = 2.7155 MW

3

DG = 79.182062 MW

Ploss = 3.2109 MW

13

DG = 60.745933 MW

Ploss = 3.3402 MW

23

DG = 36.462869 MW

Ploss = 3.3324 MW

4

DG = 98.939426 MW

Ploss = 2.3931 MW

14

DG = 26.770762 MW

Ploss = 3.8475 MW

24

DG = 44.563769 MW

Ploss = 2.9653 MW

5

DG = 73.540649 MW

Ploss = 2.4196 MW

15

DG = 51.03197 MW

Ploss = 3.0366 MW

25

DG = 33.070159 MW

Ploss = 3.4552 MW

6

DG = 104.34914 MW

Ploss = 1.8574 MW

16

DG = 44.027037 MW

Ploss = 3.4411 MW

26

DG = 13.511932 MW

Ploss = 4.0246 MW

7

DG = 81.668016 MW

Ploss = 2.0835 MW

17

DG = 62.521769 MW

Ploss = 3.1253 MW

27

DG = 46.93759 MW

Ploss = 3.1827 MW

8

DG = 80.484846 MW

Ploss = 2.3611 MW

18

DG = 37.518044 MW

Ploss = 3.2661 MW

28

DG = 79.02644 MW

Ploss = 2.3197 MW

9

DG = 93.083964 MW

Ploss = 2.1163 MW

19

DG = 40.023052 MW

Ploss = 3.1379 MW

29

DG = 21.634628 MW

Ploss = 3.6982 MW

10

DG = 79.787423 MW

Ploss = 2.4651 MW

20

DG = 41.612227 MW

Ploss = 3.1633 MW

30

DG = 22.095693 MW

Ploss = 3.5042 MW

11

DG = 92.481326 MW

Ploss = 2.1247 MW

21

DG = 62.480468 MW

Ploss = 2.6492 MW