From: A critical fault detection analysis & fault time in a UPFC transmission line
Type Of Fault in phase | θse in deg. | Fault Condition-1: 100 km from bus B-S(before UPFC) Rf = 1 Ω, FIA = 00 NSI, Vse = 5% | Fault Condition-2: 300 km from Bus B-S (after UPFC) Rf = 1 Ω, FIA = 00,NSI, Vse = 5% | Fault time in cycle | ||||
---|---|---|---|---|---|---|---|---|
A | B | C | A | B | C | Â | ||
A-G | 0 | 116.2 | 9.11 | 3.80 | −119.5 | −35.21 | −20.41 | ˂1 |
AB-G | 45 | 113.1 | 111.953 | 23.13 | −46.2 | −102.33 | 1.22 | ˂1 |
ABC | 60 | 63.25 | 115.33 | 111.38 | −103.56 | −105.09 | −100.0 | ˂1 |
BC G | 90 | 30 | 111.30 | 115.04 | −0.31 | −102.41 | −102.2 | ˂1 |