From: Parallel computing of multi-contingency optimal power flow with transient stability constraints
Contingency Line | Integration Step(s) | Iterations | Objective Function | Computation Time(s) |
---|---|---|---|---|
Branch 10–442 | 0.01 | 49 | 130.5784 | 32.6 |
0.02 | 51 | 130.5781 | 13.13 | |
Branch 681–337 | 0.01 | 18 | 130.5660 | 1.9 |
0.02 | 16 | 130.5658 | 0.96 |