Skip to main content

Table 2 Test results of NE-39 system

From: Parallel computing of multi-contingency optimal power flow with transient stability constraints

Contingency Line

Integration Step(s)

Iterations

Objective Function

Computation Time(s)

Branch 8–9

0.01

12

61.8135

0.26

0.02

11

61.8131

0.14

Branch 21–22

0.01

18

61.8208

1.16

0.02

17

61.8201

0.57