Table 2 Simulation parameters of EVs

From: Real-time vehicle-to-grid control for frequency regulation with high frequency regulating signal

Parameters
EV Aggregator number 1
EV charging station number 100
EVs number in each charging station 500
Plug-in time (h) Time ~ N (9,0.1)
Plug-out time (h) Time ~ N (16,0.1)
Initial SOC (pu) SOC ~ N (0.4,0.05)
SOC [0.2,0.8]
Expected SOC (pu) SOC ~ N (0.7,0.01)
SOC [0.4,0.9]
Battery capacity (kWh) 32
Maximum charging/discharging power (kW) 7
Maximum/minimum SOC (pu) 0.9/0.2