From: Real-time vehicle-to-grid control for frequency regulation with high frequency regulating signal
Parameters | |
---|---|
EV Aggregator number | 1 |
EV charging station number | 100 |
EVs number in each charging station | 500 |
Plug-in time (h) | Time ~ N (9,0.1) |
Plug-out time (h) | Time ~ N (16,0.1) |
Initial SOC (pu) | SOC ~ N (0.4,0.05) SOC∈ [0.2,0.8] |
Expected SOC (pu) | SOC ~ N (0.7,0.01) SOC∈ [0.4,0.9] |
Battery capacity (kWh) | 32 |
Maximum charging/discharging power (kW) | 7 |
Maximum/minimum SOC (pu) | 0.9/0.2 |