Fig. 4From: Robust fault analysis in transmission lines using Synchrophasor measurements(a) Voltage at Bus 3 for an ABG fault created in line 2–3 in the three-bus model at 0.1 s, (b) Fault Detection Signal for the ABG fault created in line 2–3 in the three-bus model at 0.1 sBack to article page