Skip to main content

Table 1 Sizing ESS without PtG (portion)

From: Coordination of battery energy storage and power-to-gas in distribution systems

Total Price Paid for Imported Power Whole Period [$]
 No Storage Surplus Power Method Surplus Power and Price Method
 4,14E + 05 3,43E + 05 3,77E + 05
Total Size of the Storage System [MWh]
 No Storage Surplus Power Method Surplus Power and Price Method
 0 331,4224 1,83E + 03
Highest Charge Rate [MW/interval]
 No Storage Surplus Power Method Surplus Power and Price Method
 0 30,995 30,995
Highest Discharge Rate [MW/interval]
 No Storage Surplus Power Method Surplus Power and Price Method
 0 10,7622 10,7622