Sl. No. | Element | Variables supporting the elements | Description |
---|---|---|---|
1 | Utility | Â | 3-phase, 60Â Hz, 154Â kV |
2 | Distributed Generators | DG 1, DG 2, DG 3 and DG 4 | 60Â Hz, 575Â V, 9Â MW, DFIG based wind farms |
3 | Transformers | Utility: T r1 | 22.9Â kV/154Â kV, 60Â Hz, 47 MVA, |
 |  | Distribution: T r2 , T r3 , T r4 and T r5 | 575 V/ 22.9 kV, 60 Hz, 10.5 MVA |
4 | Distributed Lines | DL AB (20 km), DL AE (16 km), DL BE (12 km), DL BC (02 km), DL CD (04 km). | Pi section models, positive- and zero- sequence resistances (r1, r0)Ω/km = (0.07375, 0.4054) Ω/km, positive- and zero- sequence inductances (l1, l0)H/km = (0 3.4358 × 10−3, 8.9524 × 10−3) H/km, positive- and zero- sequence capacitances (c1, c0)F/km = (0.0075 × 10−6, 0.0044 × 10−6) F/km. |
5 | Loads | L 1 (constant PQ loads) L 2 (constant PQ loads) L 3 (constant PQ loads) L 4 (constant PQ loads) L 5 (constant PQ loads) | 22.9Â kV, 60Â Hz, 12.0Â MW, 0.50 MVAR 22.9Â kV, 60Â Hz, 10.5Â MW, 0.25 MVAR 22.9Â kV, 60Â Hz, 11.0Â MW, 0.45 MVAR 22.9Â kV, 60Â Hz, 12.0Â MW, 0.15 MVAR 22.9Â kV, 60Â Hz, 10.5Â MW, 0.05 MVAR |
6 | Battery Banks |  | 1-MWh BESS is considered by integrating five 200-kWh LiFePO4 lithium–ion BESSs in parallel. |