Skip to main content

Table 1 Load shifting potential analysis of thermal storage in China

From: Active-reactive scheduling of active distribution system considering interactive load and battery storage

Location Project Name Load Shifting Potential
Beijing 94 Thermal Storage projects in 2002 200 MW
Beijing Industrial consumer 100 MW(1996), 2.3% of the peak load
Guangzhou Cold storage project at Economic Trade Commission building in 2006 240 kW
Guangxi Province Thermal Equipment in 118 consumers 162 MW, 2.3% of the peak load
Shanghai Cold storage project in Jindu Building 220 kW
Shanghai Central Air conditions system in hotel and mall 598 MW
  1. As a conclusion, load shifting potential of Shapeable Load would be enormous as thermal storage projects are promoted widely in China