Location | Project Name | Load Shifting Potential |
---|---|---|
Beijing | 94 Thermal Storage projects in 2002 | 200Â MW |
Beijing | Industrial consumer | 100Â MW(1996), 2.3% of the peak load |
Guangzhou | Cold storage project at Economic Trade Commission building in 2006 | 240Â kW |
Guangxi Province | Thermal Equipment in 118 consumers | 162Â MW, 2.3% of the peak load |
Shanghai | Cold storage project in Jindu Building | 220Â kW |
Shanghai | Central Air conditions system in hotel and mall | 598Â MW |