Skip to main content

Table 6 The energy consumption distribution of BSS with different PV capacities (PV bundling requirement = 80%)

From: Configuration and operation combined optimization for EV battery swapping station considering PV consumption bundling

PV capacity/(kW)

200

400

600

800

1,000

1,200

1,400

1,600

Valley time energy/(kWh)

2,715.909

2,659.092

2,653.409

2,179.297

1,233.234

665.1525

676.2998

165.8008

Mean time energy/(kWh)

3,320.774

2,642.929

1,780.901

1,291.263

1,095.473

966.705

618.705

12.747

Peak time energy/(kWh)

1,085.139

436.8878

418.9328

405.8543

393.9313

360.3088

55.30375

28.80975

Solar energy/(kWh)

1,426.474

2,780.979

3,663.803

4,671.89

5,839.863

7,007.833

8,175.805

9,343.777