Skip to main content

Table 7 Performance in case of different fault inception angle

From: ANN based directional relaying scheme for protection of Korba-Bhilai transmission line of Chhattisgarh state

Fault type

Fault location

Fault inception angle

Detection time of forward section

Fault phase identification time

A

B

G

AG

150

0

3

3

-

2

45

2.5

3.5

-

3.5

90

10

8

-

2

135

4.5

5.5

-

3.5

180

3

3

-

2

225

2.5

3.5

-

3.5

270

10

8

-

2

315

4.5

5.5

-

3.5

ABG

150

0

3

3

4

3

45

2.5

3.5

9.5

1.5

90

5

8

5

2

135

3.5

5.5

3.5

4.5

180

3

3

4

3

225

2.5

3.5

9.5

1.5

270

5

8

5

2

315

3.5

5.5

3.5

4.5