Skip to main content

Table 2 The limitation of ramp-rates in PV stations

From: Cost reduction of a hybrid energy storage system considering correlation between wind and PV power

Project scale Maximum variation in 10 min(MW) Maximum variation in 1 min(MW)
small capacity 0.2
medium capacity capacity/5
large capacity/3 capacity/10
  1. Technical rule for photovoltaic power station connected to Power Grid in 2011