Skip to main content

Table 4 “N-1” calibration results of main transformers in region-A

From: A diagnostic method for distribution networks based on power supply safety standards

Region

Substation

Load (MW)

Main transformer capacity (MVA)

Total capacity of 10KV Part (MVA)

Translational load of link line (MVA)

Translational Load of main trans (MVA)

Whether pass

Loss load

A

A1

41.3

2 × 40

80

5.7

40

No

1.3

A2

23

2 × 20

40

5.7

20

No

3

A3

21

2 × 20

40

0

20

No

1