From: A diagnostic method for distribution networks based on power supply safety standards
Supply level | Scope of load groups (MW) | “N-1” outage | “N-1-1” outage | comment |
---|---|---|---|---|
A | ≤2 | After maintenance: restore load groups | No requirement | |
B | 2 ~ 12 | (1) In 3 h: load restored = load groups-2 MW (2)After maintenance: restore load groups | No requirement | |
C | 12 ~ 180 | (1) In 15 min: load restored ≥ min (load groups-12 MW, 2/3 load groups). (2) In 3 h: restore load groups | No requirement | *[a] |