Skip to main content

Table 4 Optimal solutions without curtailing loads

From: Optimal scheduling strategy for virtual power plants based on credibility theory

Cost/$ α = 0.6 α = 0.7 α = 0.8 α = 0.9 Deterministic model
Start-up cost of units 400 400 200 200 200
Operation cost 145,854 145,865 146,080 146,096 146,287
Total cost 146,254 146,265 146,280 146,296 146,487