Result | Stage I | Stage II | Stage III | Stage IV | |
---|---|---|---|---|---|
AC-DC converter (MVA) | |||||
Node 8 | 1.54 | 1.54 | 1.77 | 2.02 | |
Node 19 | 0.51 | 0.51 | 2.09 | 2.13 | |
Node 27 | – | 0.10 | 1.40 | 5.19 | |
DC-DC converter (MW) | 1.50 | 1.83 | 4.39 | 8.00 | |
Storage battery (MWh) | 4.38 | 5.19 | 16.77 | 45.16 | |
ESOP investment cost (104RMB) | 50.81 | 57.76 | 179.33 | 531.20 | |
Total investment cost (104RMB) | 155.52 | 172.06 | 323.74 | 768.72 | |
Total cost (104RMB) | 2709.54 | 2628.18 | 2267.60 | 1898.25 |