Objective | Power outage time | Routing cost of MPS | Power generation cost of MPS | The number of switch action | Power losses |
---|---|---|---|---|---|
Only dispatching MPS | 107.51Â min | 1493.23 CNY | 3167.43 CNY | 0 | 334.38Â kW |
Only performing network reconfiguration | 0 | 0 | 0 | 11 | 1370.98Â kW |
Without considering power losses | 0 | 0 | 0 | 11 | 1687.80Â kW |
Resilient outage recovery method | 25.27Â min | 350.93 CNY | 36.19 CNY | 10 | 824.96Â kW |