Objective | Power outage time | Routing cost of MPS | Power generation cost of MPS | The number of switch action | Power losses |
---|---|---|---|---|---|
Only dispatching MPS | 167.66 min | 2770.80 CNY | 476.25 CNY | 0 | 68.04 kW |
Only performing network reconfiguration | ∞ | 0 | 0 | 3 | 504.83 kW |
Without considering power losses | 34.01 min | 944.65 CNY | 210.00 CNY | 4 | 543.14 kW |
Resilient outage recovery method | 34.01 min | 944.65 CNY | 442.50CNY | 3 | 123.92 kW |